CN EN
sunwoda utility scale battery storage

GAC New Energy Industrial Park 2MW/1MWh Charging Pile Energy Storage Project

Project: GAC New Energy Industrial Park 2MW/1MWh Charging Pile Energy Storage Project

Application scenario: virtual power plant

Date: September 2019

Location: Guangzhou, Guangdong

Installed capacity: 2MW/1MWh

Introduction: The project is equipped with a 30-foot 1MW/0.5MWh lithium iron phosphate energy storage system in the two outdoor parking lots in the north and south of the GAC New Energy Industrial Park. The total capacity of the energy storage system is 2MW/1MWh, and the system is connected to the grid. The main function is to participate in frequency modulation and peak-shaving and valley-filling in the park. The subsequent project needs to accept grid dispatch and participate in auxiliary services.


sunwoda utility scale battery storage GAC New Energy Industrial Park

Contact Us
we will contact you within 8H

This website uses cookies to improve your experience. By continuing to browse the site you are agreeing to our use of cookies. Cookie policy

Agree