State Grid Jilin Electric Power Co., Ltd. Frequency Regulation1MW / 500kWhProject

Application: Power generator side, frequency regulation
Date: Aug., 2016
Location: Baicheng, Jilin
Installed capacity: 1MW/500kWh LTO battery energy storage system

10MW Lithium Battery Energy Storage System Key Technology and DemonstrationProject of Shanxi Provincial Department of Science and Technology

Application: Power generation side, frequency regulation, peak shaving
Date: 2017
Location: Shanxi
Installed capacity: 10MW/9MWh

Dongguan Wuzhu Tech Demand Side Distributed ESS 2MW/4MWh Project Application: User side, peak shaving and demand response

Application: User side, peak shaving and demand response
Date: July 2017
Location: Dongguan, Guangdong
Installed capacity: 500KW/1MWh (1st), 1.5MW/3MWh (2nd)

Jiangsu Huaisheng 500kW/1370kWh Distributed Energy Storage Project

Application: User side, peak shaving
Date: Mar., 2017
Location: Huai ‘an, Jiangsu
Installed capacity: 500kW/ 1.3MWh LFP battery energy storage system

Dongguan Hongguan Precision Plastic 250kW/80kWh Distributed Energy Storage System Project

Application: User side, peak shaving, demand response
Date: December 2015
Location: Dongguan, Guangdong
Installed capacity: 250kW/80kWh LTO battery energy storage system

Changdao Transformer Substation 500 kW/500 kWh Battery Energy Storage System

Application: Microgrid
Date: April 2019
Location: Changdao, Shandong
Installed capacity: 500 kW/ 500 kWh

Key Technology Research and Demonstration Project of Power Distribution System with Multi-user Interaction in Guangzhou Power Supply Bureau Industrial Park

Application: User side
Date: July 2018
Location: Guangzhou, Guangdong
Installed capacity: 2MW/4MWh

Guangzhou Power Supply Bureau 100 kW/494 kWh Low-voltage District Energy Storage Demonstration

Application: Energy storage applied to low-voltage district
Date: January 2019
Location: Guangzhou, Guangdong
Installed capacity: 100 kW/494 kWh

Switzerland Baden 2MW/2.17MWh Li-ion Battery Energy Storage System

Application: Grid side-frequency regulation, peak shaving
Date: July 2019
Location: Baden, Switzerland
Installed capacity: 2MW/2.17MWh